LOC 250
As new, more versatile, and efficient rigs are delivered to our industry, we believe that coil tubing and casing drilling technologies will become much easier to implement and therefore more attractive. When applied properly, these technologies provide substantial well costs savings as well as improved production performance. The LOC 250 is a 6th generation rig and has been designed to economically introduce casing drilling technology into key regions which have substantial opportunities.
The unit has a 250 ton hook load capacity and its operational capabilities are:
Transported as 17 containers that are approx 48’x 8.5’x 10.5’ via normal container transport methods, requiring no special permits or equipments for handling,
Completely automated operations requiring significantly less rig crew training and number of personnel,
Can drill with either conventional drill pipe (12,000 ft) or casing (15,000 ft).
The LOC 250 unit could save up to 40% of a typical well cost in the targeted region. Furthermore, based on results from the 5th generation rigs drilling time is reduced and well production is increased significantly.
Drillmar has managed one of Tesco's casing drilling rigs (5th generation) for Apache for the last two years and has drilled +50 wells. Responsibilities include design, engineering, planning and implementation of drilling, completion and commissioning of wells as well as redesigning production systems. The work has been exceptionally successfull.
Fidelity Exploration and Production of Texas has already taken delivery of one (1) LOC250 (pictured above). Drillmar has an interest in the company.
LOC 250 general specifications:
Weight and dimensions |
||||
Total transport weight |
475 |
[mton] |
524 |
[Shton] |
Number of container units |
17 |
|
|
|
Containers for loose gear (40’) |
4 |
TBD |
|
|
Max. ISO dimensions |
|
|
|
|
Length |
12.2 |
[m] |
40 |
[ft] |
Width |
2438 |
[mm] |
8 |
[ft] |
Height standard |
2590 |
[mm] |
8’ 6” |
|
Height high cube without gooseneck |
2794 |
[mm] |
9’ 2” |
|
Height high cube with gooseneck |
2896 |
[mm] |
9’ 6” |
|
|
|
|
|
|
Infield rig move |
< 30 |
hours |
|
|
Exact number of required containers for loose gear to be determined and dependent on particular project requirements.
Hoisting gear and handling equipment |
||||||||
Mast |
Huisman |
|||||||
Max capacity |
227 |
[mton] |
250 |
[shton] |
||||
Number of falls |
8 |
|
|
|
||||
Total height |
38.1 |
[m] |
125 |
[ft] |
||||
|
|
|
|
|
||||
Drawworks |
Huisman |
|||||||
|
|
|||||||
Three motor capacity |
227 |
[mton] |
250 |
[shton] |
||||
Block speed at full load |
10 |
[m/min] |
33 |
[ft/min] |
||||
Block speed at low load |
40 |
[m/min] |
130 |
[ft/min] |
||||
|
|
|
|
|
||||
Wire line winch |
Huisman traction winch + storage reel |
|||||||
|
|
|
|
|
||||
Capacity |
14.2 |
[mton] |
31300 |
[lbs] |
||||
Block speed at full load |
70 |
[m/min] |
230 |
[ft/min] |
||||
Max. depth below surface |
4500 |
[m] |
14750 |
[ft] |
||||
|
|
|
|
|
||||
Service crane |
Huisman |
|||||||
Capacity |
6000 |
[kg] |
13200 |
[lbs] |
||||
Speed |
20 |
[m/min] |
65 |
[ft/min] |
||||
|
|
|
|
|
||||
Pipe handler |
Huisman |
|||||||
Maximum capacity |
3000 |
[kg] |
6610 |
[lbs] |
||||
Minimum diameter pipe |
60.3 |
[mm] |
2 3/8 |
[inch] |
||||
Maximum diameter pipe |
339.7 |
[mm] |
13 3/8 |
[inch] |
||||
Cycle time |
1 |
[min] |
|
|
||||
|
|
|
|
|
||||
Pipe rack |
Huisman |
|||||||
Power unit |
||||||
Main diesel engines |
3 x Volvo Penta TAD 1642 VE / GE |
|||||
Power |
494 |
[kW] |
662 |
[HP] |
||
|
|
|
|
|
||
Emergency and rig up diesel |
2 x Hatz 4L41C |
|||||
Power |
50 |
[kW] |
67 |
[HP] |
||
|
|
|
|
|
||
Fuel |
||||||
Type of fuel |
Commercial diesel oil |
|||||
Fuel consumption estimate |
3030 |
[l/day] |
800 |
[USG/day] |
||
Mud system |
||||
Mud pumps |
2 off Eweco E-800 |
|||
Power |
600 |
[kW] |
800 |
[HP] |
|
|
|
|
|
Charge / mix. Pumps |
4 off 8” x 6” x 14” |
|||
Power |
55 |
[kW] |
75 |
[HP] |
|
|
|
|
|
Shakers |
Fluid Systems Inc. linear shaker |
|||
Scalpel shakers with coarse screen |
5 |
[G] |
|
|
Second shakers with fine screen |
7 |
[G] |
|
|
|
|
|
|
|
Centrifugal degasser |
Swaco |
|||
Rotating equipment |
|||||||
Top drive |
Tesco HMIS-250 |
||||||
Max capacity |
227 |
[mton] |
250 |
[shton] |
|||
Max torque |
29200 |
[Nm] |
21500 |
[ftlbs] |
|||
Drilling torque |
14500 |
[Nm] |
10500 |
[ftlbs] |
|||
Max. speed |
210 |
[rpm] |
|
|
|||
|
|
|
|
|
|||
External casing drive assembly |
Tesco |
|
|
|
|||
Minimum size |
|
|
4 1/2 |
[inch] |
|||
Maximum size |
|
|
7 |
[inch] |
|||
|
|
|
|
|
|||
Internal casing drive assembly |
Tesco |
|
|
|
|||
Minimum size |
|
|
9 5/8 |
[inch] |
|||
Maximum size |
|
|
13 3/8 |
[inch] |
|||
|
|
|
|
|
|||
Automated Single joint elevators |
Tesco |
|
|
|
|||
Minimum size |
|
|
4 1/2 |
[inch] |
|||
Maximum size |
|
|
9 5/8 |
[inch] |
|||
Maximum capacity |
5.4 |
[mton] |
6 |
[shton] |
|||
|
|
|
|
|
|||
Rotary table |
Huisman |
||||||
Hang off capacity |
200 |
[mt] |
220 |
[sht] |
|||
Table opening (slips removed) |
700 |
[mm] |
27.5 |
[inch] |
|||
Power slips maximum size |
339.7 |
[mm] |
13 3/8 |
[inch] |
|||
Power slips minimum size |
60.3 |
[mm] |
2 3/8 |
[inch] |
|||
Well control equipment |
||||||
BOP |
T3 Services |
|||||
Double ram body |
|
|
11 |
[inch] |
||
|
690 |
[bar] |
10 |
[kPsi] |
||
Single ram body |
|
|
11 |
[inch] |
||
|
690 |
[bar] |
10 |
[kPsi] |
||
Annular |
|
|
11 |
[inch] |
||
|
345 |
[bar] |
5 |
[kPsi] |
||
|
|
|
|
|
||
Wire line BOP |
Tesco |
|
|
|
||
Double ram body |
22 |
[mm] |
|
|
||
|
345 |
[bar] |
5 |
[kPsI] |
||
|
|
|
|
|
||
Choke manifold |
T3 Services |
|||||
|
|
|
4 1/16 |
[inch] |
||
|
690 |
[bar] |
10 |
[kPsi] |
||
|
|
|
|
|
||
Drilling choke |
|
|
2 1/16 |
[inch] |
||
|
690 |
[bar] |
10 |
[kPsi] |
||